Project: I-CAVS   -  
            Listing for Category : Fuel System
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:paolo cavosi   -  
Project:   Vans - RV-10
Total Hours:2429.2
Total Flight Time:
Start/Last Date:May 28, 2019 - No Finish Date
Engine:IO-540 Thunderbolt Serial # EL-38135-48E
Propeller:MT Propeller MTV-12-B/193-53 serial 22G1268-K
Panel:Garmin G3X
 
Friendly URL: https://eaabuilderslog.org?s=I-CAVS

Home or Last Project Picture

Apr 02, 2024     37-7 Fuel System (Andair Valve Installation) - (2 hours)       Category: Fuel System
Measured and cut the extension. Drilled the connectors and inserted the safety pins. Drilled the holes on the tunnel cover. Some difficulties to have a somehow symmetric look considering that the backplate holes are not symmetrical in order to avoid wrong installation.
Temporary installation with two steel screws....need to acquire longer ones or to replace with aluminum screws or standard cadmium screws.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.